![Башня - Лахта центр Башня - Лахта центр](/images/proekty/lahta/1.jpg)
In 2018 it
will become the highest
building in Russia
and Europe
‘Lakhta Center’ - is a multi-functional large scale project of the construction of a modern business center. The headquarters of Gazprom Neft and other Gazprom Group companies will be the center of the cluster.
![Многофункциональный общественно-деловой комплекс Лахта](/images/proekty/lahta/2.jpg)
![Небоскреб Лахта центр](/images/proekty/lahta/3.jpg)
462 m.
‘Lakhta Center’ skyscraper
is 462m high and comprises
86 storeys above ground
and 3 underground storeys.
technologies are being used during
the construction of ‘Lakhta Center’
![Надежные строительные технологии](/images/proekty/lahta/4.jpg)
![Широкий ряд продукции Ancon](/images/proekty/lahta/5.jpg)
During the construction of the ‘Lakhta Center’ Tower a wide range of Ancon products are being used
There have been installed 150,000 of Ancon CXL Couplers so far
![Муфты Ancon CXL](/images/proekty/lahta/6.jpg)
All tests results comply with the standards of the Russian Federation.
Rebar connection of the reinforcing cages with Ancon CXL couplers
![Наружные стены ядра 1](/images/proekty/lahta/7.jpg)
![Наружные стены ядра 2](/images/proekty/lahta/8.jpg)
![Колонны надземной части 1](/images/proekty/lahta/9.jpg)
![Колонны надземной части 2](/images/proekty/lahta/10.jpg)
above-ground structure
In the construction of the ‘Lakhta Center’ Tower there were used welded CXL WS couplers that were manufactured with preset oblique angles for joining the surface
![Приварные муфты CXL WS](/images/proekty/lahta/11.jpg)
![Колонны надземной части 2](/images/proekty/lahta/13.jpg)
![Колонны надземной части 2](/images/proekty/lahta/12.jpg)
To connect the column and the slab in the ‘Lakhta Center’ Tower Ancon Shearfix system is used - 16 pieces of rebar D16 with forged bulb on one side and CXL coupler on the other
![Соединение колонны с плитой](/images/proekty/lahta/14.jpg)
![Система Shearfix Ancon](/images/proekty/lahta/15.jpg)
Before
pouring
concrete
![Бетонировнаие колонны](/images/proekty/lahta/18.png)
Ancon Shearfix
system in columns
pouring
concrete
![Система Shearfix Ancon в колоннах 1](/images/proekty/lahta/16.jpg)
![Система Shearfix Ancon в колоннах 2](/images/proekty/lahta/17.jpg)
![Система Shearfix Ancon в стенах 1](/images/proekty/lahta/19.jpg)
Currently more than 10,000 of Shearfix pieces have been installed
Ancon Shearfix in the walls
![Система Shearfix Ancon в станах 2](/images/proekty/lahta/20.jpg)
![Анкеры KSN](/images/proekty/lahta/21.jpg)
More than 25,000 KSN anchors and CXL-Box pieces have been installed
KSN System with Timber Anchor Carrier
has become a perfect solution for rectilinear
walls in sliding formwork
![Анкеры KSN](/images/proekty/lahta/22.jpg)
![Анкеры KSN](/images/proekty/lahta/23.jpg)
the rebar wall cage
![Армирование плиты](/images/proekty/lahta/24.png)
KSN system with metal profiles
– KSN Box
![Анкерные сборки KSN](/images/proekty/lahta/25.jpg)
Using KSN Box system provides
maximum load capacity of the structure
![Установка в армокаркас стены 1](/images/proekty/lahta/26.jpg)
![Установка в армокаркас стены 2](/images/proekty/lahta/27.jpg)
![Установка в армокаркас стены 3](/images/proekty/lahta/28.jpg)
rebar wall cage Walls
after concrete
setting
CXL Box assemblies
![Установка в армокаркас стены 3](/images/proekty/lahta/29.png)
![Установка в армокаркас стены 2](/images/proekty/lahta/30.jpg)
![Установка в армокаркас стены 2](/images/proekty/lahta/31.jpg)
in the rebar
wall cage