Khorobrovskaya Small Hydro Power Station

Is a testing site of new types of blades and turbines for small HPSs.

Khorobrovskaya Small Hydro Power Station was built as a testing site of new types of blades and turbines for small HPSs in Russian harsh climate.

Хоробровская малая ГЭС Labyrinth spillway
unit is a multi-purpose
engineering solution
for OJSC «RusHydro»

Spillway units were constructed using Ancon technology

Монтаж водосливных блоков
Spillway unit

Using Ancon technology for joining concrete units

Монтаж водосливных блоков
Сборка ANCON

Each assembly includes:
2 long E-CXL20 couplers (60mm),
2 CXL20 LN locknuts and a 152mm long dowel pin with right-handed thread

Сборка удлинненых муфт
Сборка удлинненых муфт
Сборка удлинненых муфт
Rebar end threaded for CXL 20 size
E-CXL20 coupler and locknut
Dowel pin with right-handed thread on both sides
E-CXL20 coupler and locknut
Rebar end threaded for CXL 20 size
Сборка удлинненых муфт

Annual energy output
– 1.02 mil. kWh

Height of the dam
– 5.5 and 7m
Высота плотины
Width of the dam
– approx. 200 m
 Ширина плотины
The Khorobrovskaya Small
Hydro Power Station belongs to
the run-of-river type of hydroplants.